It is time to test the entire carriage body structure, as it turns out everything is still fixed provisionally with springs in order to make some adjustments on doors and other parts, the base of the front panel is not yet complete, as there are some adjustments to do because of the brake, which runs along the front pillar of the left side of the door is then placing the hinges on the doors and their closures, a few more pictures of the construction progress of the carriage of Malaposta.







sábado, 16 de janeiro de 2016

As you can see from the images, the exterior of the box is almost complete, the side sections of the front and rear, are made separately, as can be seen, for the sake of facilitating the work and a better perfection in finish and better clarity in prominors, also gave a primer paint on the access door on the back, to test the colors and see how they fit in together, I hope you enjoy watching this progress, thanks for visiting my blog.














sábado, 9 de janeiro de 2016

Some more progress in the construction of the carriage body of Malaposta, construction of the sides, front and rear, and construction and testing of folding stairs of access to the back.